Our main living room has (had) vaulted ceilings all the way up to the second floor. While this is grand-looking, it is inefficient with heating and cooling, not to mention a colossal waste of potential space. So, we decided to close it in and make another room upstairs. This is what it looked like before!
This is after the very first step. Covering the flooring!
Then we went out of town for a week, and they got to work! Mom and Dad stopped by in the afternoons and sent us photo updates.
The pile of old railing from upstairs
Floor beams starting to go in
Subfloor poured upstairs (it was stinky!)
Framing in the front wall and doorway
The carpet up the stairs and on the upstairs landing was all covered in plastic for the duration of the project
Central vac port added!
Unfortunately, broken roof tiles added from them replacing the solid windows with windows that open.
Insulation and drywall going in
All mudded and taped!
All painted white!
The doors were finally stained and hung!
Flooring upstairs going in!
Flooring all in! Mortar/cement-like substance about to go in around the chimney.
No comments:
Post a Comment